Historic preservation and open-concept entertaining for Arts District bungalows
WTS II Contracting is a licensed Michigan residential builder specializing in kitchen remodeling throughout Three Oaks, with comprehensive load-bearing wall removal expertise in balloon-framed homes including continuous vertical stud analysis for pre-1940 construction where single studs extend from foundation to roof requiring specialized fire-blocking installation at floor levels, LVL beam sizing calculations accounting for extended bearing spans in two-story balloon-frame assemblies, and king stud reinforcement supporting concentrated beam loads transferred through continuous wall systems, combined with extensive experience navigating Village of Three Oaks building permit procedures including coordination with State of Michigan plumbing and mechanical permits administered through LARA rather than local jurisdiction—a critical dual-agency process that trips up contractors unfamiliar with Three Oaks' unique permitting structure. Our Arts District entertaining approach—featuring entertainer's islands with seating for 6-8 guests creating social focal points, unlacquered brass and matte black fixtures complementing vintage hardware in 1900s-1940s bungalows, and closed-cell spray foam insulation replacing deteriorated newspaper and sawdust original insulation eliminating drafts from agricultural fields—transforms closed segmented historic kitchens into functional gathering spaces while preserving the architectural character valued in Three Oaks' vibrant arts community.
| Specification | Details |
|---|---|
| Building Permit Jurisdiction | Village of Three Oaks (Ed Carpenter Building Inspector) OR Township |
| Plumbing Permit Jurisdiction | State of Michigan (LARA)—critical distinction from building permits |
| Housing Stock Era | 1900s–1940s bungalows and farmhouses (Arts & Crafts, balloon-frame construction) |
| Design Aesthetic | "Journeyman" style—reclaimed wood, industrial metals, matte finishes |
| Common Challenge | Balloon-frame wall removal, knob-and-tube wiring, sagging floor joists |
| Typical Timeline | 8–12 weeks (includes multi-agency permits, historic structural repairs, rewiring) |
Three Oaks' Arts District bungalows built 1900s-1940s predominantly use balloon-frame construction where wall studs run continuously from foundation sill to roof plate—creating unique structural challenges when removing kitchen walls that modern platform-framed homes do not encounter. Load-bearing wall removal in balloon-framed homes requires specialized fire-blocking and support techniques.
Understanding balloon-frame construction:
The balloon-frame wall removal complications:
WTS II Contracting's balloon-frame wall removal approach:
Phase 1: Structural Engineering and Analysis
Phase 2: Temporary Support Installation
Phase 3: LVL Beam Design and Sizing
Phase 4: Wall Removal with Fire-Blocking Installation
Phase 5: Second-Floor Joist Reinforcement
Phase 6: Finish Work and Inspection
Cost Analysis for Balloon-Frame Wall Removal:
Three Oaks historic homes feature undersized 2x8 floor joists spanning 14-18 feet—adequate for original loads but deflecting under weight of modern stone countertops and heavy islands creating unlevel surfaces that crack tile and cause cabinet racking.
The joist deflection problem in 1900s-1940s construction:
The consequences of installing on sagging floors:
WTS II Contracting's floor reinforcement solutions:
Solution 1: Joist Sistering (Structural Repair)
Solution 2: Blocking and Bridging (Stiffening Existing Joists)
Solution 3: Self-Leveling Underlayment (Surface Correction)
Solution 4: Schluter-Ditra Uncoupling Membrane (Tile Protection)
Three Oaks historic bungalows originally insulated with newspaper, sawdust, or no insulation at all—creating drafty kitchens where cold air infiltrates from surrounding agricultural fields during Michigan winters. Kitchen renovations provide opportunity to properly insulate without tearing into finished walls throughout home.
The historic insulation deficit:
The drafty kitchen experience:
WTS II Contracting's insulation upgrade during kitchen remodeling:
Closed-Cell Spray Foam (Premium Solution):
Rockwool (Mineral Wool) Batts (Fire-Resistant Alternative):
Dense-Pack Cellulose (Eco-Friendly Option):
Installation Timing and Code Requirements:
Three Oaks has complex permitting where building permits issue through Village of Three Oaks but plumbing and mechanical permits route through State of Michigan (LARA)—DIY renovators and inexperienced contractors apply to Village for all permits and discover plumbing work cannot proceed without separate state approval.
Understanding Three Oaks' dual permit system:
The DIY/contractor confusion pattern:
WTS II Contracting's multi-agency permit management:
Pre-Construction Permit Coordination:
Inspection Scheduling:
Cost of Permits:
Opening walls in Three Oaks Arts District bungalows frequently reveals active knob-and-tube wiring from 1900s-1940s installation—obsolete electrical system creating fire hazards and insurance coverage denials requiring complete replacement during kitchen remodels.
Knob-and-tube wiring characteristics and hazards:
Why knob-and-tube requires replacement:
WTS II Contracting's kitchen rewiring approach:
Complete Kitchen Electrical Upgrade:
Panel Upgrade (Usually Required):
Whole-House Rewiring Consideration:
Modern NEC requires electrical outlets in kitchen islands—minimum one outlet for first 9 square feet with additional outlets for larger islands. Standard countertop-mounted outlets conflict with popular waterfall-edge quartz installations requiring creative solutions maintaining aesthetics while meeting code.
The island outlet code requirements:
The waterfall edge aesthetic challenge:
WTS II Contracting's code-compliant aesthetic outlet solutions:
Solution 1: Pop-Up Countertop Outlets (Most Popular for Waterfall Edges)
Solution 2: Side-Mount Outlets (Non-Waterfall Sides)
Solution 3: End-Panel Outlets (Narrow Islands)
Island Electrical Planning:
We specify materials capturing Arts District character with modern durability:
Yes, building permits go to the Village or Township, but plumbing usually goes to the State—understanding this dual-agency requirement critical for smooth project execution. Building permits (Village of Three Oaks or Township): Required for any structural work—wall removal, framing modifications, foundation work. Application submitted to Village Hall (if within Village boundaries) or Township Hall. Building Inspector Ed Carpenter reviews plans for structural adequacy. Inspections at rough-in (framing exposed) and final (work complete). Permit fees: $150-400 depending on project value. Approval timeline: 1-2 weeks typical. Plumbing permits (State of Michigan through LARA): Required for all plumbing work—drain relocations, supply line modifications, fixture installations. Application goes to state-licensed plumbing inspector—NOT Village building department. Separate application, separate fees ($100-300), separate inspection schedule. Inspector may be different person than building inspector—must coordinate schedules. Common mistake: Applying only to Village/Township for all permits—discovers mid-project that plumbing work cannot proceed without state permit. Mechanical permits: HVAC modifications typically also require state-licensed inspector approval. Ductwork relocation, ventilation system installation (range hoods ducted to exterior). Electrical permits: May be Village/Township or state-licensed inspector depending on scope—verify jurisdiction before starting. Why dual permitting exists: State-licensed trades (plumbers, HVAC) regulated by State of Michigan professional licensing. Local building departments handle structural/building code compliance. Ensures qualified inspectors review specialized trade work. WTS II permit coordination service: Submit building permit to Village/Township. Simultaneously submit plumbing/mechanical permits to appropriate state agencies. Coordinate inspection scheduling so building and plumbing inspectors approve work before closing walls. Track all permits through approval and final sign-off. Total timeline with proper coordination: 2-3 weeks permit approval, 8-12 weeks construction. Improper coordination adds 3-6 weeks mid-project delays.
Yes, but it requires an engineered beam and fire-blocking to maintain structural integrity—balloon-frame homes built before 1940 present unique challenges requiring specialized expertise. Balloon-frame construction characteristics: Continuous studs run full building height—foundation to roof (16-24 feet long). Second-floor joists rest on ribbon boards notched into studs—not on top plates like modern platform framing. Open wall cavities basement to attic—no fire-blocking at floor levels creating chimney effect during fires. Load path: Roof weight transfers directly through continuous studs to foundation. Used pre-1940 when long dimensional lumber readily available. Why balloon-frame wall removal more complex: Cutting first-floor studs eliminates support for second-floor joists resting on ribbon boards—must be replaced with engineered beam. Beam must support both second-floor weight AND roof weight—heavier loading than platform-frame equivalents. Fire-blocking must be installed at floor level per modern code—prevents fire spread through continuous cavities. King studs at beam ends must be reinforced—typically tripled or quadrupled to handle concentrated loads. Professional engineer typically required—stamps drawings verifying structural adequacy. WTS II balloon-frame wall removal process: (1) Structural engineering—engineer analyzes loads (roof, second floor, snow, live loads). Designs LVL beam sized for total loads—typically 3.5" x 14-18" for 12-16 foot spans in two-story homes. Specifies king stud reinforcement and fire-blocking requirements. PE stamps drawings—required for permit approval, (2) Temporary support—install temporary walls extending full building height (basement to attic). Supports carry all loads currently on studs to be removed. Critical: Never remove load-bearing studs before temps in place, (3) Installation—cut continuous studs at first-floor ceiling level. Install fire-blocking between studs—2x4 horizontal blocking creating compartmentalization. Install engineered LVL beam in ceiling pocket—flush-mount for seamless appearance. Connect beam to reinforced king studs with Simpson Strong-Tie hardware. Support severed upper studs on beam using joist hangers—maintains roof load path, (4) Inspection and finish—building inspector verifies structural work per engineer's drawings. Install drywall creating continuous ceiling—beam hidden or exposed. Remove temporary supports after beam fully secured. Cost: $8,000-17,000 for balloon-frame wall removal versus $4,000-8,000 platform-frame. Premium justified—prevents second-floor settlement and structural damage costing $20,000-50,000 to repair. Signs of balloon-frame construction: Home built before 1940. Two-story construction. Basement shows continuous studs running up to first floor. Attic shows same studs continuing to roof. If uncertain, have contractor examine framing before planning wall removal.
$40,000–$80,000 depending on how much electrical and structural updating is needed—Three Oaks bungalows built 1900s-1940s typically require comprehensive infrastructure upgrades beyond cosmetic improvements. Budget breakdown by scope: (1) Cosmetic update ($25,000-40,000)—new cabinets, countertops, appliances, flooring in existing layout. Minimal structural work. Electrical and plumbing reused if adequate. Fresh paint and modern finishes. Appropriate if: Home already updated mechanically, no layout changes desired, budget-focused approach, (2) Moderate historic renovation ($40,000-60,000)—includes cosmetic updates PLUS: Remove non-load-bearing wall opening kitchen to dining room ($800-2,000). Replace knob-and-tube wiring in kitchen only ($3,000-5,000). Install new kitchen circuits meeting NEC 2023 (8-12 dedicated circuits). Minor floor leveling with self-leveling underlayment ($600-1,200). Insulation upgrade in exterior walls ($800-1,500). Period-appropriate materials (white oak cabinets, honed quartz, unlacquered brass). Appropriate if: Modest structural needs, wiring localized to kitchen, accessible foundation for minor repairs, (3) Comprehensive historic transformation ($60,000-80,000+)—includes moderate scope PLUS: Load-bearing wall removal in balloon-frame construction ($8,000-17,000). Electrical panel upgrade 60-amp to 200-amp ($3,000-6,000). Whole-house knob-and-tube rewiring ($8,000-15,000 additional). Structural floor repairs—joist sistering ($2,500-6,000). Closed-cell spray foam insulation ($800-1,500). Large functional island with prep sink and dishwasher ($10,000-24,000). High-end period finishes throughout. Appropriate if: Significant structural issues, electrical system inadequate, planning long-term ownership, desire comprehensive modernization. Three Oaks-specific cost factors: Balloon-frame wall removal more expensive than platform-frame—requires engineering and specialized techniques. Knob-and-tube wiring common—budget for replacement discovered during demolition. Sagging floors typical in 80-120 year-old homes—structural repairs often necessary. Dual permitting (Village + State) adds $300-900 permit costs. Multi-agency inspections extend timeline—budget for extended contractor time. ROI considerations: Kitchen remodels return 70-80% at resale per Remodeling Magazine—highest interior improvement. Historic home buyers in Arts District expect updated kitchens—outdated kitchens major deterrent. Proper structural and electrical work protects property value—prevents discovery issues during future sales. Quality materials appropriate for historic homes—white oak, soapstone, unlacquered brass command premium in Three Oaks market. Cost-saving strategies: Keep existing layout if functional—eliminates plumbing rerouting costs. Limit island size or skip prep sink—saves $3,000-5,000. Choose painted cabinets over white oak—reduces cost $30-80 per linear foot. Select honed quartz over soapstone—lower maintenance, similar aesthetic. Phase electrical work—kitchen circuits now, whole-house rewire later.
WTS II Contracting also serves surrounding communities. Learn about our kitchen remodeling services in:
Get a detailed estimate from a licensed Michigan general contractor who specializes in historic Arts District renovations—balloon-frame wall removal, knob-and-tube rewiring, and period-appropriate materials creating entertainer's kitchens in Three Oaks' celebrated bungalows.
Request Your Free Estimate